“The Great Nelson Lake Train Wreck” occurred on May 9, 1903, between the McKeever and Minnehaha Stations on New York Central Railroad’s Adirondack line, also known as the Mohawk and Malone.
The map here shows these two remote flag-stops, Nelson Lake (starred) in between. On that fateful day, two regularly scheduled express trains began their trips with standing orders giving the Montreal Express (Train No. 650) the right-of-way to meet a train originating in New York City (No. 651) at Nelson Lake, passing that train parked off on the sidetrack.
When Train 651 arrived in Remsen, the station Dispatcher Irvin W. Payne divided it into two sections, the acting Superintendent of the railroad, William J. Fripp, traveling northward in the second (or rear) section with other railroad officials on an inspection tour.
Two subsequent “Train Orders” were issued by the dispatcher just prior to and soon after that train’s stop in Remsen. Edward J. Neville, the engineer of southbound Train 650, received both of those orders at his Fulton Chain stop just 19 minutes prior to the crash at Nelson Lake. The collision occurred on Saturday afternoon at 3:06 pm.
Henry Harter, a railroad authority and author of this line’s history, Fairy Tale Railroad, called this “the most severe collision that ever occurred on the Mohawk and Malone.”
The crash was followed by an immediate on-sight investigation by Fripp, statewide press coverage, a May 20th inquest in Herkimer County Courthouse, and an official Railroad report to the State Senate in Albany dated May 26th. That official report, published just 17 days after the crash, made the following judgement:
“The accident was due entirely to a disregard of orders by Engineman Neville, which directed him to pass train No. 651 at Nelson Lake; instead of doing so he passed that point at full speed. He states that he was under the impression that McKeever, the next regular stop south, was the meeting point.”
In that freewheeling age of railroading, with federal regulation in its early stages, the Adirondack line was no stranger to frequent accidents and derailments.
My sketch here of an earlier Big Moose accident just to the north offers one such example.
But after a thorough review of all the sources for this 1903 crash, this writer contends the report’s verdict was “a real railroad job” — colloquial for a pre-ordained outcome which ignores what a court of law finds to be fact.
This 1913 photo captures a scene just to the north, the Minnehaha Station, with a sidetrack off to the left like the one at Nelson Lake.
My first impression of the tragic event came from the press reports, one of which noted that “a noble work was done by two trained nurses” who saved lives at this remote flag-stop 50 miles north of Utica.
My investigation thus began with “My Trainwreck Tribute,” a poem which repeats many of the words and phrases used in the dramatic press reports that described the train wreck. (The poem will run at New York Almanack on Saturday.)
Facts of the Case Before the Crash
On this 1898 Schedule for the Adirondack Division, I highlighted in yellow the times for regular stops (marked “s”) and flag-stops (“f”) for northbound 651 and southbound 650.
In 1903, five years later, these two trains were still making this daily run, with one important change, their meeting point at Nelson Lake (added in pink). Train No. 651 left the New York Central Station at 8:30 am, as stated, picking up Assistant Superintendent Fripp and his railroad team in Albany at 11:13 am, their destination the Adirondacks.
They switched to the Adirondack Division, leaving Utica at 1:05 pm, train control and safety charged to a crew of three – Conductor F. H. Foulkes, Engineman W. R. Plato, and Fireman James McCaffrey. By this Schedule, Train No. 651 normally pulled into Remsen Station at 2 pm, where the train was split in two and a Train Order issued.
Trains were split into multiple sections for several reasons, when there was not enough room for additional freight or passengers, or as in this case, when one train with a common starting point was headed for different destinations.
At the inquest, Fripp testified he did not know if Train No. 651 had ever been divided, but on this Saturday it was. VIPs were on board and their Second Section was to stop near Saranac Lake, the First Section of 651 to continue to Montreal.
Dispatcher Payne knew of the plan to create two Sections of Train 651 and was ready to hook up that Second Section of the train to Engine 29 seen here, an inspection locomotive called “the monitor Mohawk.” News sources covered routine railroad inspections by “Trainmaster Fripp,” and this was one of them. Albany Conductor James W. Lewis and Engineer Judge were put in charge of “2nd No. 651,” also designated as 2d 651 in Train Orders and at the official inquest.
Engineman Plato and Fireman McCaffrey continued to run “1st No. 651” pulled by Engine No. 2004 and its tender car with coal and water. Conductor Foulkes oversaw the other cars, three baggage cars and one mail, smoker, coach, kitchen, and Pullman dining car. Some of these cars would have been put on the second Section of 651. Apparently two of the baggage cars housed animals for an acting company’s show in Montreal.
Train Order (TO) No. 44 – known in railroading as “a 31 Passing Order” – was hand-written and carbon copied by Dispatcher Payne, then handed to the Conductors for both Sections before leaving Remsen, written out as follows:
“Train Order No. 44 (May 9, 1903) Conductor and Engineer of No. 651 at Remsen: “No 651 will display signals Remsen to Lake Clear Jct for Eng 29. No. 650 will take siding and meet 1st & 2nd No. 651 at Nelson Lake” F. A. H. Repeated @1:55 pm.”
Railroading jargon here related two important facts: (1) Engine Nos. 2004 and 29 posted a signal indicating one train (651) was split into two, 2nd No. 651 formed in Remsen and bound for Lake Clear Junction near Saranac Lake; and (2) the Montreal Express (No. 650) was now to take the siding at Nelson Lake, allowing both Sections of 651 to meet and safely pass it there. This was a reversal of the standard passing order for these trains.
The signature F. A. H. was that of Agent Harrington of Albany, who did not issue but would have approved the Train Order written by Dispatcher Payne, and by railroad procedure, would later receive and file it. And as stated, TO No. 44 was read to both Conductors who then were to read it aloud to the Engineers.
They in turn “Repeated” it back to the Conductors. That happened for TO 44 at 1:55 pm. By checking this 1:55 pm time against the Schedule, it appears that Train 651 arrived in Remsen about 10 minutes early.
At 2 pm, the Montreal Express (Train 650) was passing Big Moose Station (almost two hours north) as 1st No. 651 was pulling out of Remsen. 2nd No. 651 followed five minutes later. The Senate report revealed that Engineer Neville had taken charge of Train 650 in Tupper Lake at 12:37 pm after five hours of sleep. It departed from Montreal at 8:15 am. His train crew included Conductor John O’Connor and Fireman William Yorden. Train No. 650 also pulled eight cars.
Most of the stations Train No. 650 passed after Tupper were flag-stops, without a telegraph office. What that meant was Neville and his train crew could not receive Train Order No. 44 until their ten-minute telegraph station stop at Fulton Chain.
Also known as Thendara, it is pictured on this 1913 Postcard. The Schedule had No. 650 arriving in Fulton Chain at 2:44 pm, almost an hour after TO 44 had been issued and 22 minutes before the crash. But in fact, Neville was running behind schedule, pulling into Fulton Chain about 2:48 pm, faced at that time with two Train Order’s to repeat and digest.
Nelson Lake was just 14 minutes away. Time was now pressing with two sections of 651 to meet and pass and a reversal of the right-of-way order 650 normally had for this run. Later accident reports highlighted the stress building up for Neville and his crew.
Was Train Order System Factor in the Crash?
If the reader is getting frustrated with train jargon and abbreviations, they’re paying attention. The legal findings of the May 20th inquest would indict this older Train Order system as one key factor in the crash. This sample TO is printed out on a standard form, replete with abbreviations. Train professionals were only too happy to be rid of TO’s when the system finally faded. Before writing this article, I assumed train movement was quite simple. One rail-pro set me strait:
“Much of railroading is guided by the laws of physics: First, two trains cannot occupy the same place at the same time, yet their movements are confined to one-dimensional space (forward and backward) in the absence of switches that allow progress in a second dimension out of each other’s way. Second, train brakes have a very limited ability to corral a train’s inertia, because of the low coefficient-of-friction between the steel wheels and steel rail. Thus, a minor oversight in authority or protection can be magnified to disastrous proportions simply because engineers can neither steer, nor stop their train on a dime.”
The US Department of Transportation declared railroading to be the second most dangerous vocation in the United States in 1893, second only to coal mining. In the post-Civil War economic boom, railroad tracks were laid at a frantic pace, safety taking a backseat to profit and expansion. Bridges collapsed, tracks failed, boilers exploded, training was inadequate, and “employees worked long hours and without sufficient rest between tours of duty.”
Death and injury to railroad workers peaked by 1900 – 188 killed and 3,803 injured that year in a workforce of 191,198, largely due to operator negligence and rail equipment defects. Public outcry at the turn of the century led to a series of federal laws under multiple titles like these: Safety Appliance Acts, Hours of Service Act, Accident Reports Act, Signal & Train Control Act, Locomotive Inspection Act, and Certification of Engineers Act.
Train Orders were created by the industry to allow two trains to make it intact to the other end of the line. Prior to this innovation a rail plan was dispatched by Morse Code to trains starting out in locations like Montreal and New York City.
This worked fine until either train fell behind or broke down. When events like these took place, not at all uncommon, things fell apart in a hurry. At the time of this accident, training for engineers was elementary at best and certification non-existent.
TO’s were made possible by Samuel Morse’s telegraph, one of the most overlooked inventions in American history, which came to railroads in 1851. Electrical impulses carried messages over the wires, and stations that had receivers (such as in this picture) converted these back into readable text to pass along to Conductors for stopped or moving trains.
The newly created train order system made mid-route corrections possible, and rail travel smoother and safer. TO’s soon evolved into multi-paged booklets containing “General Codes of Operating Rules” which took many years to master, an engineer relying on his multi-member crew to figure out and follow the TO orders to the “T.” Add to this the complexity of trackside train signals, such as those in this illustration, and rail travel could get even more confusing.
Several principles guided the movement of trains, authority to be on a track of first importance. Trains 650 and 651 both had authority to be on the M&M track between McKeever and Minnehaha from 2:45 to 3:03 pm on that day, because they were listed as regularly scheduled trips on the Adirondack Division’s Time Table No. 28. This was a daily run with standing train orders for safe passage.
Second, the standard Train Order for these two trains gave the Montreal Express (650) superiority, or right-of-way to run on the main line while the inferior train, the Herkimer Express (651), switched to the sidetrack at the normal meeting point, Nelson Lake.
Protection was a third principle. Engineers and conductors were expected to keep current on volumes of paperwork – timetables, rule books, notices, signals, special instructions, and more.
TO’s performed this function, protecting trains from a head-on or rear-end collision when they met. Protection was not just up to the engineer, it was a shared responsibility by a train crew which included the train’s conductor, engineer, fireman, and often a front and rear switchman.
The TO system had many weak points, beyond a train crew’s just plain misinterpreting an order. TO’s were usually hand-copied using carbon paper, each copy less clear and penmanship iffy.
TO’s were often delivered to passing trains using a “hoop” device or delivery fork (pictured here), paperwork often falling into the weeds beside the track. Lights, engine numbers, and special signals on both ends of a train could easily be confused at night or in bad weather. A dispatcher might issue a new order that was to take precedence over earlier ones, creating confusion. “Specials” — often unscheduled freight trains — ran between the schedule for regular trains. And what if a train stalled between stations? The future advent of radio and telephone would fix many of these problems with trains getting messages in real time.
The May 26th Senate Accident Report pinned fault for the Great Nelson Lake Train Wreck on Engineer Neville. Do these systemic weaknesses in the TO system exonerate him? Certainly not.
But a critical crash timeline, tracking train movements between the Remsen and Fulton Chain Stations after 2:30 pm on that fateful Saturday afternoon, will implicate the whole 650 crew for the crash. And the Inquest would later implicate this Train Order system as one factor in the accident.
Critical Crash Timeline
2:31 pm — First No. 651 pulled into the White Lake Station at 2:31 pm, a regular stop with a telegraph office, the Schedule indicating a 31-minute trip from Remsen to White Lake. However, Second No. 651 with Asst. Supt. Fripp and RR officials aboard ran into problems “by adverse signals and other causes.”
Dispatcher Payne’s only source on this would have been a telegraph message from 2nd 651 at its regular stop in Forestport, one station away from White Lake. Due there at 2:21 pm, an assumed delay of 10 minutes would have put 2nd 651 there at 2:31 pm.
Train Order No. 44 called for Train 650, then 18 minutes north of the station at Fulton Chain, to take the sidetrack at Nelson Lake, but Neville would not receive TO 44 until reaching his next telegraph stop.
Payne suddenly realized that Neville’s train would now have to wait almost 15 minutes on the Nelson Lake Siding to let both sections of 651 pass on the main track, putting all three trains further off schedule. To fix this time-loss he issued a new 31 Passing Order, Train Order 47, as follows:
“Train Order No. 47 to second No. 651 at White Lake, No. 650 at Fulton Chain: “2d No. 651 will take siding and meet No. 650 at McKeever instead of Nelson Lake.” F. A. H. Repeated at 2:32 PM ”
The rail crew’s Operating Book had two rules that now came into play with the crash just 35 minutes off. Two quotes may help clarify the drama as these three trains approached each other:
“Rule 206 — Regular trains will be designated in train orders by their numbers, as “No. 10,” or “2d No. 10,” adding engine numbers, as “extra 798,” with the direction when necessary, as “east” or “west.” Other numbers and time will be stated in figures only.
“Rule 210 — When a “31” train order has been transmitted, operators must repeat it at once from the manifold copy in the succession in which the several offices have been addressed, and then write the time of repetition on the order.
“Each operator receiving the order should observe whether the others repeat it correctly. The conductor must read his order aloud to the operator; the copy for each engineman must be delivered personally by the conductor, and the engineman must read it aloud to the conductor before proceeding.”
The reader will note here that TO No. 47 abbreviated Fripp’s second section 651 pulled by the Mohawk as “2d No. 651” per Rule 206. Abbreviations and rules would come under intense scrutiny at the inquest.
Rule 210 called for an elaborate multi-crew exchange to ensure message accuracy. If TO No. 47 was repeated at 2:32 pm, both sections of 651 probably received it at the same time, 1s No. 651 in White Lake, 2d No. 651 in Forestport.
This second rule also highlighted the multi-crew responsibility for train safety. Rule 210 mandated a real communication dance for Train 650’s ten-minute stop at Fulton Chain, now behind schedule by at least 5 minutes and “meeting” both Sections of the Herkimer Express imminent.
2:48 pm – Neville’s last telegraph access for 650 had probably been Tupper Lake where he boarded, so he had been totally out of the loop until he pulled in for his ten-minute stop shown here in Fulton Chain.
The station agent or telegraph operator J. Kennedy was anxious to pass on two new TO’s to Train No. 650, caught in a two-hour message blackout. The communication dance came in a hurry, Kennedy rushing two sets of handwritten orders with carbon copies to Conductor O’Connor. Verbiage was the same as that received earlier by both sections of 651, except for “Repeated” — 2:53 pm for TO 44 and 2:55 pm for TO 47.
This turned out to be a fatal two minutes. O’Connor gave his side of the story at the inquest:
“At Fulton Chain I got two copies of the orders, No. 44 and 47, and gave one to the engineer who then read it to me … I read the second order to the agent, Kennedy, and then handed it to Fireman Yorden. Neville was on his seat. I said “Ed, meet second 651 at McKeever instead of Nelson Lake.” I gave the order to Yerdon, and then the order to go. We left at about 2:56 … We stopped at Minnehaha and got two passengers.”
While this flurry of activity was going on, 2nd 651 had stopped in White Lake, preparing to carry out revised TO No. 47 when it reached McKeever. At 2:48 pm, Plato’s 1st 651 was passing Otter Lake.
While the Schedule shows 11 minutes from Otter to Nelson Lake, 18 minutes elapsed before Engineman Plato and his crew collided with Neville’s train. Plato’s slowdown was to ensure that Train No. 650 reached and took the Nelson Lake Siding BEFORE he passed on the main track.
Engineer Neville had a very different story. He recalled hearing his Conductor refer to Train No. 651 taking the siding at McKeever, without reference to a “2d” or “2nd,” the Rule’s abbreviation for the second section of a train.
He and his Fireman also missed this abbreviation on the second Train Order, No. 47. Both assumed they had the right-of-way through to McKeever where the whole of Train 651 would be safely sided for them to pass on the main track.
Fireman Yorden could not testify as he was scalded to death in the crash. When Neville later reread his TOs, he saw the “2nd” in front of “No. 651.” The only explanation he could offer was that he had put his thumb over that abbreviation when he took it from Yerden, as shown in this illustration.
Conductor O’Connor added several important details in his inquest testimony. After fulfilling his duty with the TO’s and welcoming two new passengers aboard from the flag-stop in Minnehaha, he instructed his head Brakeman Frank Morey to go to the front of the train and be ready to engage the brake and throw the switch for their train to enter the Nelson Lake Siding, per the first Train Order, No. 44.
Clearly both O’Connor and Morey expected their train to slow down approaching Nelson Lake, normally a 7-minute trip. That did not happen.
3:05 pm – Neville’s Montreal Express (650) left Fulton Chain at 2:56 pm according to O’Connor, now behind Schedule by 10 minutes. The unexpected flag-stop in Minnehaha just added to the time loss. To make up for lost time Neville rushed “at a high rate of speed,” estimated at 50 to 60 mph, expecting to meet both sections of the Herkimer Express at McKeever.
A minute before the crash Conductor O’Connor was collecting tickets in the coach, Brakeman Morey poised to switch the train over to the Nelson Lake Sidetrack. Both men had to be very concerned about their speed, and in those last few minutes missed opportunities to act.
At 3 pm the Mohawk (2nd 651) had reached and taken the McKeever Siding as shown here, about five minutes behind 1st No. 651. The railroad’s investigative report to the NY Senate stated that Plato’s 1st 651 “was under reduced speed, prepared to stop at the passing siding.”
Lawrence P. Gooley’s excellent New York Almanack article “A Small Error Leads to a Terrible Adirondack Railroad Accident,” estimated Plato’s speed approaching Nelson Lake “at about 10 to 15 miles per hour, slowing for the upcoming turn onto the side rail at Nelson Lake.”
Both these sources make it sound as if Plato was preparing to take the siding, but that was clearly not the case. Engineer Plato had slowed down because he was waiting to spot Train 650 off on the Nelson Lake Siding so he could safely pass per TO No. 44.
3:06 pm – Engineer Plato survived the crash with a broken back and other severe injuries, but did not testify at the inquest. His search for 650 on the sidetrack turned to sudden panic at the speeding train bearing down on him. The collision occurred just 1,000 feet below the south switch on the Nelson Lake Siding.
Engineer Neville spotted the northbound train (1st 651) about 150 feet into a four-degree curve. He testified that he grabbed the handle of the brake valve, yelled at Fireman Yerdon to “get off,” and jumped off his train. Bruised and shaken up, he survived, but Yerdon did not.
In those last moments, Conductor O’Connor expressed concern about his train’s speed, knowing that 1st 651 had right-of-way on the main track. In his testimony later he confessed that “it came to me at once”:
“I expected that the train would stop at the north end of the siding to let out the head brakeman to open the switch. The switch is long enough to hold 23 cars. As soon as I heard the click I threw the emergency brake as high as I could. From the south end of the siding where I think I heard the switch click, to the point we struck was 1,800 feet.”
Brakeman Morey had moved to the front of the train waiting for it to stop, to engage the brakes, jump off, and throw the switch. He testified that “he didn’t observe when we passed the north end of the switch … I reached for the door knob and the crash came.”
The Great Nelson Lake Train Wreck was the worst on this rail line, but it would have been much more serious if the northbound train had been moving faster.
The investigative report detailed the injuries to persons and to “rolling stock,” declaring both trains to be a total loss. The Montreal Express had two deaths and 32 injuries, the Herkimer Express suffered just one death and five injuries.
When Assistant Superintendent Fripp got word of the tragedy, he immediately headed north from McKeever in a sidecar to take charge of the accident scene. One of his first actions was to secure all copies of the Train Orders. Conductor O’Connor set guards along this remote stretch of tracks to protect mail, baggage, and personal valuables.
By 8 pm a wrecking train arrived from Utica with 40 laborers to clear the tracks. A special compound engine was secured from McKeever to pull the two engines apart, a task that took several days, with this statement released by the wrecking foreman:
“To look at the wreckage was only to urge it as miraculous that so few were fatally injured. Engine 2004 of the northbound, like the other was still upright, but the cab was crushed into what was left of the tender and the huge machine hung poised in the air from being interlocked with the other locomotive.
“The cylinders, steam chests and huge pieces of metal inches in thickness were bent so as to be unserviceable at all … The engines were locked together as though they had been built so, and hours were spent in tearing them apart.”
A surgeon arrived from Old Forge on a special 4 pm Fulton Chain relief train. Two more surgeons followed. Immediate injuries to these 37 passengers were attended to by a theatrical company traveling with the northbound train, two members of which were said to be trained nurses.
News reports did indicate that all 200 passengers, divided evenly between the two trains, suffered some kind of shock or injury.
Court at Odds with Railroad Industry
Eleven days after the crash, Dr. William E. Hayes – Coroner for Herkimer County – presided over an Inquest in Herkimer Superior Court to determine the cause of death of three railroad men and to investigate the cause(s) of the train crash. Assisting him was District Attorney George W. Ward, taking testimony and cross-examining thirteen witnesses associated with the accident.
Not surprisingly, on May 20th the Coroner found that the three who perished in the crash came to their death from shock, the result of severe bodily injuries caused by a head-end collision between two trains.
However, Dr. Hayes spread responsibility for the crash beyond the southbound Engineer to most of his train crew. This Utica Observer headline, “Big Wreck Was Accidental,” capped the news of his professional judgement seasoned by his Adirondack context, and mixing justice with mercy:
“After very careful investigation of the matter, I do not feel warranted in saying that there is any criminal neglect on the part of Engineer Neville and I, as coroner of Herkimer county, look upon the error as accidental, offering him the same consideration that coroners have given those hunters who in the past few years, have gone out to hunt for deer and have by accident shot down either their companion or a guide.”
After acknowledging Neville and Yerden’s “serious mistake” in missing the abbreviation “2d” on Train Order 47 and thus making a fatal assumption, the Coroner took direct aim at Assistant Superintendent Fripp and the whole railroad industry, with the following “recommended” change in practice:
“I hereby recommend that rule 206 in the Book of Rules of the operation department of the NY Central be so changed as to read without abbreviations, such as ‘1st’ and 2d 651,’ for I believe that had order 47 been written thus: ‘Second section, No. 650,’ instead of using abbreviation ‘2d’ that the accident at Nelson Lake would not have occurred, and I think the time should not be far hence when all train orders should be typewritten, thereby legible and easily understood.”
The Coroner did not stop there. Next, he took Conductor O’Connor’s Brakeman, Frank Morey, to task as one who certainly could have minimized the impact of the disaster had he acted on what he knew:
“Then, it is my opinion that Trainman Morey, who was especially directed by Conductor O’Connor after leaving Minnehaha to go to the head end of the train and be prepared to throw the switch at Nelson Lake to let the train in on the siding, should have (knowing the road and in the reading of Order 47) recognized when his train passed the switch at the north end of Nelson Lake siding, that Engineer Neville was running by his orders, and immediately applied the emergency brake, and had he done so, the brakes would have been applied a distance of 3,300 feet and the speed of the train would have been much less when they came together, thereby causing less destruction of property and possibly saving life.”
I find myself in full agreement with Coroner Hayes on his findings but would just go one step further and call out Conductor O’Connor for not acting much sooner than he did to stop the train. If train movement was the responsibility of the whole crew, then the Conductor of that era was the point person for authority, communication, and safety.
Knowing 1st 651 was coming on the main track with six minutes between the Minnehaha Station and Nelson Lake Siding, Neville’s speed that dangerous two or three minutes should have triggered alarms for O’Connor. It was just too late when he applied the emergency brakes seconds before the crash.
If Morey was negligent, then O’Connor much more so. In his passenger car there was a bell rope that signaled the locomotive, which apparently failed. His last resort was the emergency air brake system. Had he pulled that a minute or two before the crash, the disaster certainly could have been prevented.
And what about Dispatcher Payne? He admitted under oath he could have spelled out TO No. 47 to better alert Engineman Neville that two sections of Train 651 had to be met and passed, one of them approaching him on the main track. Several railroad men commented on how complicated the two Train Orders were, received by Neville only minutes before the crash.
Payne’s Train Order directions remind me of a very challenging slalom course maneuver. If it had worked, it would have gone down like this: Train 2nd 651 takes McKeever Siding (3 pm); Train 650 takes Nelson Lake Siding (3:05 pm); Train 1st 651 passes 650 at Nelson Lake for Montreal (3:07 pm); Train 650 reenters the main track and passes 2nd 651 at McKeever, for Utica (3:14 pm); and Train 2nd 651 reenters the main track and proceeds north past Nelson Lake to Lake Clear Junction (3:15 pm).
Interestingly, Payne testified at the inquest that by “revising” Train Order 44 to 47 and siding 2nd 651 at McKeever, he shaved four or five minutes off 650’s sidetrack-delay at Nelson Lake. This almost sounds to me like boasting in front of the boss. Certainly, he did not cause the crash, but I think he set up the conditions that made it more likely.
The accident report to the NYS Senate was published just six days later, September 26, by Arnold H. Sutermeister, the Grade Crossing Bureau head, a Troy appointee of the State Railroad Commission.
A copy of that report was sent to the New York Central Railroad Company. With Fripp investigating the cause of the accident before Sutermeister, the conclusions of these two railroad men lined up: Engineer Neville was THE cause of the accident.
Lawrence Gooley’s article on the wreck followed this same official line. After doing my critical crash timeline, this to me was a miscarriage of justice, scapegoating one easy target for the crash and ignoring the important public call for reform and action – and yes, that included emergency action to prevent the accident.
Life Lessons from the Tragedy
My interest in this case was and is a tribute to the “two trained nurses,” unnamed but it turns out members of a theatrical company enroute to a show in Montreal. The line I included in my poem, “a Texas Steer driver attended his stock,” was partly wrong and partly right. “Texas Steer” referred to a show performed by the Bandit King Theatrical Company, which had two animal cars attached to the first Section of Train No. 651, full of trained horses, a donkey, pigs, and other animals. Lawrence Gooley pointed out in his article that this show was made into a movie in 1929.
The posters shown here display advertising for James H. Wallick’s “Bandit King,” a play in six acts based loosely on the life of Jesse James, the famous acting horses purported to be those of the notorious bandit himself. According to Smithsonian, the show featured horses and buffalo, bona fide cowboys and Native American actors, and displays of sharpshooting and trick riding. Wallick was born in Hurley, New York, his birth name Patrick J. Fubbins. Some of the show animals were killed in the crash. But the actions taken by these actors deserve praise. On May 11th, The Gloversville Daily Leader offered this:
“The railroad men and members of a theatrical company (Wallack’s ‘Cattle King’) aboard the north-bound train at once went to the aid of the injured. There were several lawyers aboard the train, but not a doctor. The railroad men all agree that two or three of the ladies in the theatrical company worked most efficiently.
“They procured from a wreck trunk articles of women’s wearing apparel which they tore into strips, making bandages which they applied. The railroad men believe that two of the ladies were trained nurses, so quietly and effectually did they go about their work … The men of the theatrical troupe were fashionably dressed, but they took hold like old hands, used to acting in emergencies.”
If a movie of this incident were to be produced, these would be the heroes and heroines in the tragedy. I think of them now like the soldier who saved my life after I tripped a booby trap during the Vietnam War, with the hospital staff who nursed me back to health.
But it was also satisfying for me to set the record straight for a highly praised and experienced train engineer with 20 years of service, whose career ended in 1903.
I now wonder whether the other members of Neville’s train crew felt any guilt over a verdict which to me was “a complete railroad job,” brushing aside each of the judgements made by a court of law charged with finding the accident’s cause. Acting Superintendent Fripp went on to enjoy a very distinguished railroading career.
Many of us are familiar with Johnny Cash’s classic rendition of “The Wreck of the Old 97.” Well, this is my story about “The Great Nelson Lake Train Wreck,” also with a life lesson or two.
Illustrations, from above: Map of the Adirondacks Showing How to Reach Them by the New York Central Lines, NY Heritage Digital Library at Adirondack Experience, ca 1912; Pencil sketch by Noel Sherry of Train Derailment at the Big Moose Station, 1898; Waiting for a Train in Minnehaha in 1913, courtesy of Goodsell Museum, Old Forge; The Montreal Express Engine No. 2004 at Lake Clear Junction ca. 1910, courtesy of the Harter Collection; Time Table No. 28 for the NY Central & Hudson River RR’s Adirondack Division (highlighted by Noel Sherry); NY Central Inspection Locomotive #29 “Mohawk,” courtesy of NYHeritage.org; Postcard of Depot at Fulton Chain Station, also known as Thendara; Copy of Train Order No. 11 for the Southern Pacific RR, 1955; RR Signals Illustration, American Railway Association, 1910; Richard Hoskins’ “Man in Railroad Telegraph Office” for article “Impact of the Telegraph on the Railroad,” May 10, 2022; Train Order Signal Hoop Pole (courtesy Showcase Niniatures); Diagrams created by Noel Sherry to show train locations at 2:31 and 2:48 pm; Illustration created by Lawrence P. Gooley for his “A Small Error Leads to a Terrible Adirondack Railroad Accident” in New York Almanack, April 24, 2012; 17-18; Diagrams created to show train locations at 3:05 and 3:06 pm; Herkimer County Courthouse, courtesy of Doug Kerr, Wikipedia; “Big Wreck was Accidental, an Error, Not Criminal Negligence, Says Coroner,” in The Utica Observer, June 2, 1903; “Jas Wallick’s Bandit King” in National Museum of American History, Smithsonian; Advertisement for “Jas Wallick & His Acting Horses,” in National Museum of American History, Smithsonian; and Virginia signpost for “The Wreck of the Old 97.”
Thank you Noel Sherry … a compelling retell of a horrific event. Up to your usual standards.
Thanks Bob, appreciate the feedback. I was very happy with this piece because my research exposed the original judgement as quite poor, given what happened. My first interest in the story was the nurses who were heroic in a tragedy, then I found out what I think really went down. Very satisfying.